OZEV-APPROVED INSTALLERS

EV Charger Installation in Harlow

Stern MEB installs 7 kW Mode 3 home EV chargers across Harlow, from the new-build estates around Harlow Town station to the older semis in Old Harlow. We're OZEV-approved and NICEIC-registered, which means you're covered for the EV Chargepoint Grant if you're in a flat or rental property. Free site survey, fixed price, no surprises.

OZEV Approved Installer
NICEIC Approved Contractor
£5M public liability insured
20+ years’ experience

EV charger installation in Harlow, by Stern MEB

NICEIC Approved Contractor
NICEIC Domestic Installer
OZEV Approved Installer
TrustMark
CHAS Accredited
WHAT WE DO

Residential EV Charging for Harlow Homes

Whether you've got a Victorian terrace near the museum quarter or a new-build townhouse on one of the estates off Fifth Avenue, we'll spec, install and commission the right charger for your car and your parking. Most installs done in a day.

Home charging

7 kW Mode 3 chargers for driveways and garages, smart-tariff ready.

  • Ohme, Hypervolt, Easee, Pod Point
  • Up to 15m armoured cable run
  • Type-A RCD & Type B/2 surge
  • NICEIC certificate & building notice

Workplace charging

1 to 10 chargers for offices, retail and small fleets, with load management.

  • 7 kW or 22 kW units
  • Smart load management
  • Workplace Charging Scheme grant filed
  • Back-office software & reporting

Commercial & fleet

Multi-bay AC and DC rapids, with civils and DNO liaison handled in-house.

  • 22 kW AC, 50 kW & 150 kW DC
  • DNO liaison & sub-mains
  • Civils, ducting, bay marking
  • Maintenance & 24/7 fault response
Why Stern MEB

Why Harlow Drivers Choose Stern MEB

We're a 20-minute run up the M11 from our Woodford Green workshop, so we know Harlow's building stock, concrete frame town houses, the older stock around Potter Street, the flats above the town centre. That means we quote accurately and turn up with the right kit.

OZEV Grant Expertise

If you're in a flat or renting, you may qualify for the OZEV EV Chargepoint Grant. We handle the application, the paperwork, and the install, one invoice, one point of contact.

Fixed-Price Quotes

Free site survey, fixed price on the day. No hidden extras for cable runs or consumer unit upgrades. If your board needs work, we tell you before we start.

NICEIC-Approved Installs

Every charger install comes with an NICEIC installation certificate and Building Control notification. Your insurer and mortgage lender will want to see that if you ever sell.

Local Response Times

We're based in Woodford Green, so Harlow is on our patch. Most surveys booked within the week, installs typically within two weeks of sign-off.

How it works

From first call to certificate, four clean steps.

1

Brief

Tell us your address, scope and any deadlines via the form or call the office.

2

Survey

Free site visit (or remote photos for simple jobs). We confirm scope and route.

3

Install

Carried out around your operational hours. Site-clean, dust-managed.

4

Certify

NICEIC certificate, building notice where required, then aftercare on call.

Where we work

Harlow and the surrounding area

Harlow is a straight run north from our Woodford Green office, twenty minutes up the M11, off at Junction 7. We cover the whole town and out to Old Harlow, Sawbridgeworth, and Roydon, so if you've got a second property or a rental portfolio across the area, we can handle multi-site installs on one PO.


We cover all CM17, CM18, CM19 and CM20 postcodes, plus surrounding villages and commercial sites along the A414 corridor.

Common questions

Harlow FAQs

Do I need planning permission to install an EV charger in Harlow?+
Generally no, provided the charger is on your own property and not facing a highway in a conservation area. Harlow has a few designated zones around the old town centre, so we'll flag it at survey if your install needs a check with the council. Most residential installs are permitted development.
Can I claim the OZEV grant if I live in a Harlow flat?+
Yes, if you're in a flat or renting and you've got dedicated off-street parking. The grant covers up to £350 or 75% of the install cost, whichever is lower. We submit the claim on your behalf and deduct it from the final invoice.
How long does a typical EV charger install take in Harlow?+
Most domestic installs are done in half a day if your consumer unit is up to spec and the cable run is straightforward. If we need to upgrade the board or run armoured cable across a drive, budget a full day. We'll confirm timings after the free site survey.
Will my charger work if I change my car?+
Yes. All the 7 kW Mode 3 chargers we install use the Type 2 socket, which is the UK and EU standard. Every new electric car sold in the UK since 2018 uses Type 2, so you're future-proofed even if you swap brands.
Ready when you are

Get a Fixed-Price EV Charger Quote in Harlow

Call us or fill in the form and we'll book your free site survey, usually within the week.

Or call us directly
0800 612 7654
  • Free site survey
  • Fixed-price quote
  • NICEIC certificate
  • 12-month workmanship warranty

Book a free site survey

Harlow · same working day response