ELECTRIC VEHICLE CHARGING

EV Charger Installation London, OZEV-Approved Electricians

Stern MEB installs home and workplace EV chargers across every London borough. We're OZEV-approved, NICEIC-registered and based in Woodford Green (IG8), covering the capital from our East London base. Every job starts with a free site survey and ends with a fixed-price invoice, no guesswork, no hidden extras.

OZEV Approved Installer
NICEIC Approved Contractor
£5M public liability insured
20+ years’ experience

EV charger installation in London, by Stern MEB

NICEIC Approved Contractor
NICEIC Domestic Installer
OZEV Approved Installer
TrustMark
CHAS Accredited
WHAT WE INSTALL

EV Charging Solutions Across London's Homes, Businesses and Estates

We fit chargers in Victorian terraces with no off-street parking, new-build flats with shared car parks, commercial premises needing multiple units, and everything in between. Whatever your property type or power supply, we'll spec the right charger and handle the DNO paperwork.

Home charging

7 kW Mode 3 chargers for driveways and garages, smart-tariff ready.

  • Ohme, Hypervolt, Easee, Pod Point
  • Up to 15m armoured cable run
  • Type-A RCD & Type B/2 surge
  • NICEIC certificate & building notice

Workplace charging

1 to 10 chargers for offices, retail and small fleets, with load management.

  • 7 kW or 22 kW units
  • Smart load management
  • Workplace Charging Scheme grant filed
  • Back-office software & reporting

Commercial & fleet

Multi-bay AC and DC rapids, with civils and DNO liaison handled in-house.

  • 22 kW AC, 50 kW & 150 kW DC
  • DNO liaison & sub-mains
  • Civils, ducting, bay marking
  • Maintenance & 24/7 fault response
Why Stern MEB

Why London Drivers and Businesses Choose Stern MEB

London's mix of old housing stock, shared parking, TfL Low Emission Zones and complex DNO areas means EV charger installs need local knowledge. We've been wiring London properties for two decades, we know the grid, the parking restrictions and the building regs inside out.

OZEV-Approved for Grant-Funded Installs

We're on the OZEV installer register, so if you're eligible for the EV chargepoint grant (flats, rentals, workplace schemes), we handle the application and claim directly. You pay the net price.

Fixed-Price Quotes After Every Site Survey

Every install starts with a free survey. We check your fuseboard, earthing, parking layout and cable route, then give you a written price that won't change. No provisional estimates, no site-visit surprises.

DNO Applications and Upgrades Managed In-House

If your supply needs upgrading or you're installing a 22kW three-phase unit, we submit the DNO application (UKPN, SSE, whichever covers your postcode) and coordinate the meter work. One point of contact, start to finish.

Commercial Multi-Unit Installs and Load Management

We install chargers for office car parks, retail estates, logistics depots and housing developments. Load-balancing, OCPP back-ends, dedicated sub-mains, whatever the spec calls for, we'll design it, certify it and commission it.

How it works

From first call to certificate, four clean steps.

1

Brief

Tell us your address, scope and any deadlines via the form or call the office.

2

Survey

Free site visit (or remote photos for simple jobs). We confirm scope and route.

3

Install

Carried out around your operational hours. Site-clean, dust-managed.

4

Certify

NICEIC certificate, building notice where required, then aftercare on call.

Where we work

London and the surrounding area

Our Woodford Green office sits just inside the M25 on the Essex, London border, giving us quick access to every corner of the capital. We're on site in Zone 1 in forty minutes, out to Heathrow or the southern boroughs in under an hour.


We cover all London postcodes (E, N, NW, SE, SW, W, EC, WC) plus surrounding boroughs and multi-site commercial work across the M25 corridor.

Common questions

London FAQs

How long does an EV charger install take in a typical London terraced house?+
Most single-unit home installs take half a day once the charger's delivered and any DNO work is done. If we're running cable from a rear fuseboard to a front driveway through solid walls, or if we need to upgrade the main fuse, allow a full day. We'll confirm timings after the site survey.
Can you install a charger if I park on-street or in a shared residents' car park?+
On-street installs need council permission and a dedicated crossing, most London boroughs don't approve them. Shared car parks (common in flats) are feasible if you own a designated space and the freeholder or management company agrees. We'll advise on cable routing, supply upgrades and any communal-area regs during the survey.
Do I need a three-phase supply for a fast charger in London?+
No. Most homes have single-phase supplies (up to 100 A) and a 7 kW charger works fine, overnight you'll add 30, 35 miles of range per hour. Three-phase (22 kW) makes sense for commercial fleets or if you're already on three-phase and need faster turnaround. We'll check your supply and recommend the right unit.
Which EV charger brands do you install and why?+
We fit Ohme, Zappi, Hypervolt, Andersen and EO, all OZEV-approved, all with smart scheduling and app control. Choice usually comes down to budget, aesthetics and whether you want solar integration or load balancing. We'll talk you through options at survey stage and order once you've decided.
Ready when you are

Get Your London EV Charger Quote This Week

Call us or fill in the form and we'll arrange a free site survey at a time that suits, evenings and weekends included.

Or call us directly
0800 612 7654
  • Free site survey
  • Fixed-price quote
  • NICEIC certificate
  • 12-month workmanship warranty

Book a free site survey

London · same working day response