WORKPLACE CHARGING

Workplace EV Charging Installation Across Essex

We install workplace EV charging across Essex for businesses, offices, depots and industrial sites. OZEV-approved installers, NICEIC-certified, with access to the Workplace Charging Scheme offering up to £350 per socket. Free site survey and fixed-price quotations.

OZEV Approved Installer
NICEIC Approved Contractor
£5M public liability insured
20+ years’ experience

EV charger installation in Essex, by Stern MEB

NICEIC Approved Contractor
NICEIC Domestic Installer
OZEV Approved Installer
TrustMark
CHAS Accredited
WHAT WE INSTALL

Commercial EV Charging Solutions for Essex Workplaces

From single-unit offices in Chelmsford to multi-bay depots on the A12 corridor, we design and install charging infrastructure that fits your site, your budget and your employees' needs. Three common setups:

Home charging

7 kW Mode 3 chargers for driveways and garages, smart-tariff ready.

  • Ohme, Hypervolt, Easee, Pod Point
  • Up to 15m armoured cable run
  • Type-A RCD & Type B/2 surge
  • NICEIC certificate & building notice

Workplace charging

1 to 10 chargers for offices, retail and small fleets, with load management.

  • 7 kW or 22 kW units
  • Smart load management
  • Workplace Charging Scheme grant filed
  • Back-office software & reporting

Commercial & fleet

Multi-bay AC and DC rapids, with civils and DNO liaison handled in-house.

  • 22 kW AC, 50 kW & 150 kW DC
  • DNO liaison & sub-mains
  • Civils, ducting, bay marking
  • Maintenance & 24/7 fault response
Why Stern MEB

Why Essex Businesses Use Stern for Workplace Charging

Essex has everything from new-build business parks near Harlow to Victorian mill conversions in Colchester and sprawling logistics hubs around Basildon. We know the building stock, the DNO constraints, and how to get installations signed off without dragging timelines.

OZEV Workplace Charging Scheme

We handle the full grant application for the OZEV Workplace Charging Scheme, securing up to £350 per socket (max 40 sockets). You get the discount applied at invoice stage. No upfront paperwork, no chasing vouchers.

Multi-Site Project Experience

We've wired EV infrastructure across multiple Essex sites for clients with depots in Thurrock, offices in Brentwood, and warehouses near Stansted. One point of contact, consistent spec, coordinated timelines.

Load Management & Future-Proofing

Most Essex commercial supplies can't handle ten 7kW chargers switching on at 9am. We design load-balanced systems that share available capacity intelligently, and we leave spare ways in the board for the next phase when your fleet grows.

Fast Turnaround, Minimal Disruption

Installations are scheduled around your operating hours. Small office car parks are typically done in a day. Larger depot jobs are phased so you don't lose parking bays or access for deliveries.

How it works

From first call to certificate, four clean steps.

1

Brief

Tell us your address, scope and any deadlines via the form or call the office.

2

Survey

Free site visit (or remote photos for simple jobs). We confirm scope and route.

3

Install

Carried out around your operational hours. Site-clean, dust-managed.

4

Certify

NICEIC certificate, building notice where required, then aftercare on call.

Where we work

Essex and the surrounding area

We're based in Woodford Green, twenty minutes from the M25 and ideally placed to cover the whole of Essex. Whether you're on a trading estate in Romford, a business park in Braintree, or an industrial unit near Southend, we're on-site quickly and we know the area.


We cover all Essex postcodes and regularly handle multi-site rollouts across the county and into East London.

Common questions

Essex FAQs

Can we claim the OZEV Workplace Charging Scheme grant in Essex?+
Yes, provided you're a registered business, charity or public-sector body with off-street parking. The scheme offers up to £350 per socket, capped at 40 sockets per site. We submit the application, you get the discount at invoice. Grant is subject to OZEV eligibility and budget availability.
What if our Essex site has a three-phase supply but limited headroom?+
We assess your existing board, calculate diversity, and design a load-managed system that shares available capacity across chargers. If an upgrade is needed, we liaise with UK Power Networks (the DNO for most of Essex) and handle the application. You'll know costs and timelines upfront.
Do you install chargers at depots with HGV access or tight parking layouts?+
Yes. We've worked on logistics depots, coach yards and industrial estates across Essex. Cable routes are planned to avoid loading bays and turning circles, and posts are positioned to protect units from reversing vehicles. Site survey is always free.
How long does a typical workplace EV charging installation take in Essex?+
A small office car park with two to four chargers is usually completed in one day. Larger sites with ten-plus units, trenching, and board upgrades can take three to five days, phased to keep disruption minimal. Lead time from survey to install is typically two to four weeks, depending on equipment and DNO approvals.
Ready when you are

Get a Free Workplace EV Charging Survey in Essex

Call us or request a callback and we'll visit your site, assess your supply, and provide a fixed-price quote with OZEV grant factored in.

Or call us directly
0800 612 7654
  • Free site survey
  • Fixed-price quote
  • NICEIC certificate
  • 12-month workmanship warranty

Book a free site survey

Essex · same working day response