Skip to content
  • Home
  • Building Services
  • Mechanical & Electrical
  • Electric Vehicle Charging
  • Blog
  • Our Accreditations
  • Contact Us
  • London skyline panorama with the City
    Why Every Office Should Plan EV Charging Before 2030

Why Every Office Should Plan EV Charging Before 2030

stern2026-05-07T09:03:54+01:00

The UK government's 2030 ban on new petrol and diesel car sales isn't some distant target. It's six years away.

Why Every Office Should Plan EV Charging Before 2030stern2026-05-07T09:03:54+01:00
  • Multiple EV chargers in a fleet car park
    Fleet Electrification: 5 Expensive Mistakes UK Businesses Make

Fleet Electrification: 5 Expensive Mistakes UK Businesses Make

stern2026-05-07T09:03:53+01:00

Fleet electrification isn't optional anymore. The 2030 ban on new petrol and diesel vehicles is coming whether you're ready or not.

Fleet Electrification: 5 Expensive Mistakes UK Businesses Makestern2026-05-07T09:03:53+01:00
  • Workplace EV charging bay in a UK office car park
    Workplace Charging Scheme: A Plain-English Guide for UK SMEs

Workplace Charging Scheme: A Plain-English Guide for UK SMEs

stern2026-05-07T09:03:49+01:00

The Workplace Charging Scheme exists because the government wants more businesses to install EV chargers.

Workplace Charging Scheme: A Plain-English Guide for UK SMEsstern2026-05-07T09:03:49+01:00
  • Hand holding electrical certificate on a clipboard
    OZEV Grant Explained: Who Qualifies and How to Claim in 2026

OZEV Grant Explained: Who Qualifies and How to Claim in 2026

stern2026-05-07T09:03:48+01:00

The OZEV grant landscape has shifted considerably since its peak. If you're a homeowner Googling whether you can still get £350 off a home charger, the short answer is no…

OZEV Grant Explained: Who Qualifies and How to Claim in 2026stern2026-05-07T09:03:48+01:00
  • Electrician installing an EV charger on a wall
    EV Charger Installation Cost in the UK (2026 Guide)

EV Charger Installation Cost in the UK (2026 Guide)

stern2026-05-07T09:03:47+01:00

The sticker price on an EV charger tells you almost nothing about what you'll spend. A £600 unit can turn into a £2,400 job if your consumer unit needs upgrading or the c…

EV Charger Installation Cost in the UK (2026 Guide)stern2026-05-07T09:03:47+01:00
  • Three-phase distribution board
    The Best EV Chargers for UK Driveways in 2026

The Best EV Chargers for UK Driveways in 2026

stern2026-05-07T09:03:52+01:00

You've bought the EV. Now you need a charger on your drive that won't let you down at half-six on a Monday morning.

The Best EV Chargers for UK Driveways in 2026stern2026-05-07T09:03:52+01:00
  • EV charger on a residential driveway, UK home
    7 kW vs 22 kW: Which EV Charger Is Right for Your Home?

7 kW vs 22 kW: Which EV Charger Is Right for Your Home?

stern2026-05-07T09:03:50+01:00

Most homeowners installing an EV charger face the same question: do I need 7 kW or 22 kW? The answer isn't about future-proofing or bigger-is-better.

7 kW vs 22 kW: Which EV Charger Is Right for Your Home?stern2026-05-07T09:03:50+01:00
  • Close-up of EV charging plug being connected
    Tethered vs Untethered EV Chargers: Which Should You Choose?

Tethered vs Untethered EV Chargers: Which Should You Choose?

stern2026-05-07T09:03:51+01:00

Walk into any car park in Woodford Green or Stratford and you'll see both types: chargers with cables permanently attached (tethered) and those with just a socket where y…

Tethered vs Untethered EV Chargers: Which Should You Choose?stern2026-05-07T09:03:51+01:00
  • Team of UK electricians on a commercial site
    EV Charger Installation Day: What Actually Happens and How Long It Takes

EV Charger Installation Day: What Actually Happens and How Long It Takes

stern2026-05-07T09:03:52+01:00

You've booked the installation. You've cleared the driveway. Now you're watching the clock and wondering what the next few hours actually look like.

EV Charger Installation Day: What Actually Happens and How Long It Takesstern2026-05-07T09:03:52+01:00
  • Commercial electrician working on a panel
    From Design to Certificate: How a Commercial Electrical Project Actually Runs

From Design to Certificate: How a Commercial Electrical Project Actually Runs

stern2026-05-07T09:04:00+01:00

Most commercial electrical projects don't fail because of bad kit or dodgy wiring. They fail because nobody explained the actual process, so expectations drift, timelines…

From Design to Certificate: How a Commercial Electrical Project Actually Runsstern2026-05-07T09:04:00+01:00
12Next

Comprehensive mechanical, engineering and building services, covering London and Essex. Trusted for over 20 years in the industry. 

Stern MEB is a trading name of Stern Site Services Ltd
Company Number: 13888682

CONTACT DETAILS

  • info@stern-meb.co.uk

  • 0800 612 7654

  • 19 Mill Lane, Woodford Green, Essex, IG8 0UN

Send Us A mEssage

© Copyright 2026 | Stern MEB by Vivid Beginnings | All Rights Reserved

Page load link